KondiDoc: технологические расчеты в кондитерском производстве
To get a calculation for 1000 or your specified output is required:
1) Sign up;
2) having received a registration letter confirm your E-mail and phone number;
3) Sign in.
4) In case of problems call +7 (495) 510-12-33 we work 7:00-19:00 Moscow time

Technological map Filling

Name of raw materials and semi-finished products

Mass fraction of solids,%
Consumption of raw materials
for semi-finished products, g
Raw material consumption for0.8303 kg
finished product, g
Coffee paste
in kind
in solids
Sign up98.0 11.8 11.8 11.6 
Butter mass fraction of fat 82.5% [Skurikhin: unsalted sweet cream butter]84.0 5.9 5.9 5.0 
Total raw materials for semi-finished products17.7 —  —  
Output of convenience foods17.4 —  —  
Sign up78.0 —  377.6 294.6 
Whole condensed milk with sugar the weight ratio of fat 8.5%74.0 —  298.9 221.2 
Granulated sugar99.85—  188.8 188.5 
Cognac—  —  18.3 —  
Alcohol—  —  14.1 —  
Total Raw—  915.4 720.9 
The output of semi-finished products in the finished product17.4 —  —  
Output finished product86.0 714.1 
Humidity14.0 ±2.0%6.7%—  —  

Description of the technological process.

The technological process of production consists of the following stages:
  1. Preparation of raw materials for production.
  2. Preparation - Coffee paste
  3. Preparation - Filling
  4. Packaging, labeling, storage and transportation.

  1. Preparation of raw materials for production.
  2. The preparation of raw materials for production should be carried out in accordance with the relevant section of the collection 'Technological instructions for the production of flour confectionery' (AgroNIITEIPP, M., 1992), SP 2.3.6.1079-01 'Sanitary and epidemiological requirements for catering organizations, manufacturing and the turnover capacity of food products and food raw materials in them 'and the current' Instructions for preventing the ingress of foreign objects into products at enterprises of the confectionery industry and in cooperatives'.

  3. Preparation - Coffee paste
  4. Preparation - Filling
  5. Packaging, labeling, storage and transportation.
  6. Packaging, labeling, storage and transportation should be carried out in accordance with requirements of TU.