KondiDoc: технологические расчеты в кондитерском производстве
To get a calculation for 1000 or your specified output is required:
1) Sign up;
2) having received a registration letter confirm your E-mail and phone number;
3) Sign in.
4) In case of problems call +7 (495) 510-12-33 we work 7:00-19:00 Moscow time

The cost of raw materials for Burnt

Cost

Name of raw materials

Raw material consumption, kg
on 239.3 kg
finished products
Price 1 kg
Cost
RF Central Bank rate
Sign up193.66 65.15 ₽
12,616.95 ₽1.0
water48.05 0.41 ₽
19.70 ₽1.0
Total241.72 12,636.65 ₽
Output239.30 12,636.65 ₽