KondiDoc: технологические расчеты в кондитерском производстве
To get a calculation for 1000 or your specified output is required:
1) Sign up;
2) having received a registration letter confirm your E-mail and phone number;
3) Sign in.
4) In case of problems call +7 (495) 510-12-33 we work 7:00-19:00 Moscow time

Technological map Candy body No. 293

Name of raw materials and semi-finished products

Mass fraction of solids,%
Consumption of raw materials
for semi-finished products, g
Raw material consumption for0.9383 kg
finished product, g
Candy mass
in kind
in solids
Sign up99.85390.5 390.5 389.9 
Roasted almond kernel97.5 244.2 244.2 238.1 
Granulated sugar (for syrup)99.85219.7 219.7 219.4 
Cognac—  73.2 73.2 —  
Starch syrup78.0 32.5 32.5 25.4 
Sign up—  0.490.49—  
Total raw materials for semi-finished products960.59—  —  
Output of convenience foods929.3 —  —  
Sign up99.85—  19.0 18.9 
Total Raw—  979.59891.7 
The output of semi-finished products in the finished product929.3 —  —  
Output finished product92.7 869.8 
Humidity7.3 ±2.0%7.5%—  —  

Description of the technological process.

The technological process of production consists of the following stages:
  1. Preparation of raw materials for production.
  2. Preparation - Candy mass
  3. Preparation - Candy body No. 293
  4. Packaging, labeling, storage and transportation.

  1. Preparation of raw materials for production.
  2. The preparation of raw materials for production should be carried out in accordance with the relevant section of the collection 'Technological instructions for the production of flour confectionery' (AgroNIITEIPP, M., 1992), SP 2.3.6.1079-01 'Sanitary and epidemiological requirements for catering organizations, manufacturing and the turnover capacity of food products and food raw materials in them 'and the current' Instructions for preventing the ingress of foreign objects into products at enterprises of the confectionery industry and in cooperatives'.

  3. Preparation - Candy mass
  4. Preparation - Candy body No. 293
  5. Packaging, labeling, storage and transportation.
  6. Packaging, labeling, storage and transportation should be carried out in accordance with requirements of TU.